Cookies on this website
We use necessary cookies to run this website. With your permission we also use analytics cookies to understand how the site is used, and marketing cookies to measure our advertising. Privacy and cookies

Thorough examination and inspection of lifting equipment, lifting accessories and drilling equipment by qualified inspectors, to recognised British, European and API standards.

Type A inspection body accredited by EGAC
Inspection · ISO/IEC 17020 (Type A)
Lifting equipment and accessories, non-destructive testing, visual inspection, tubular goods and drilling equipment, pre-shipment inspection of labelling and marking, sampling of food products and inspection of food hygiene processes, applied in accordance with ILAC P15.
Accreditation details

Schedule number to be added
Lifting equipment and accessories must be examined at defined intervals, and before first use or after significant repair, to confirm that they remain safe for continued use. GQCL inspects lifting equipment in accordance with BS 7121-2-3, BS EN 13414 and BS EN 13889, together with the applicable regulations and the manufacturer's instructions.
For the oil and gas sector, GQCL inspects tubular goods and drilling equipment to Category III, IV and V requirements based on DS-1, API Spec 5CT and API RP 4G.
What you receive
An inspection report stating the condition and fitness for use of each item against the applicable requirements, with any defects identified.
What is covered
The same defined steps apply to every engagement, confirmed with you before work begins.
You define the item, the location and the applicable requirements, and we confirm the method and the inspector.
Qualified inspectors examine, test or measure the item using the agreed standard and method.
A clear, impartial report of findings against each requirement, signed by the authorised inspector.
Intervals are set by the applicable regulations, the manufacturer's instructions and the conditions of use. Thorough examinations are commonly required every six or twelve months, depending on the equipment, and after any repair or incident that may affect safety.
The inspector records the defect and its severity in the report. Equipment with a defect that makes it unsafe is identified as not fit for use, and the owner is informed immediately.